CDM Projects

Plexus along with its collaboration have exhaustive experience and project references.

A) CDM Projects
1) Prefeasibility, DPR, and PDD for CER under CDM for Installation of 10 Mw Biomass Cogeneration power plant at Ramala in (U.P.) Client Finite Energy Ltd. New Delhi.
2) Prefeasibility, DPR and PDD for CER under CDM for installation of 8 Mw bagasse based cogeneration Power Plant at Baghpat (U.P)- Client Finite Energy Ltd. New Delhi.
3) Prefeasibility , DPR , PDD for CER under CDM and EPC for Installation of 5 mw Solar Power Plant at Naraingarh Haryana- Client Kuvam Energy Pvt .Ltd.
4) Prefeasibility study report for installation 10 MW Waste Wood based Power Project at Uttaranchal.
5) Prefeasibility study report for installation 8 MW Waste Wood based Power Project at Himachal.
6) Prefeasibility, DPR , PDD for CER under CDM and EPC for Installation of 5 mw Solar Power Plant at Purnia Bihar.

B) CDM Projects (CER & VER)
1) Pre -feasibility & PDD for Carbon Credit from Energy Efficiency through CFL distribution- in more than 30 cities in India. New Delhi
2) Carbon Credit from Energy Efficiency by replacement of LED based Lights with HPSV and Metal Halide lights in Mumbai and many Cities.
3) Carbon Credit from generation of Green power in rice husk based cogeneration Power Plant in Ludhiana.
4) Carbon Credit from generation of Green power in rice husk based cogeneration Power Plant in Kurushetra Haryana.
5) Carbon Credit from generation of Green power and Methane computerization 1.6 MW Power Plant at Palwal , Haryana.
6) Pre Feasibility study report for evaluation of Carbon Credit for cogeneration captive Power Plant. Unnao U.P
7) Pre Feasibility study report for evaluation of Carbon Credit for cogeneration captive Power Plant. U.P
8) Pre Feasibility study report for evaluation of Carbon Credit for cogeneration captive Power Plant. Noida U.P
9) Pre Feasibility study report for evaluation of Carbon Credit for Methane Cauterization.
10) Pre Feasibility study report for evaluation of Carbon Credit for Mustered crop residue based 7.5 MW cogeneration captive Power Plant at Rajasthan.